CLICK ANY THUMBNAIL BELOW FOR A LARGER VIEW!

Reforestation
Control of invasive plant species
Eliminating the step of hauling debris will reduce project costs as well as leaving a layer of mulch behind to reduce erosion

Pre-Fire Suppression
Create "pre fire buffer zone" around timber tracts and large municipal held greenspace areas.
Construction of "pre fire buffer zones" or fire breaks have limited environmental impact/destruction by simply mulching the respective areas then deeply plow to assure substantial mulch soil contact. This technique also minimizes affects of soil erosion.

Power Distribution Lines
Clear to prepare for new line construction.
Maintenance of existing right of way lines.

Sewer/Water Infrastructure Lines
Clear to prepare for new line construction.
Maintenance of existing lines.
Inspection's of current infrastructure lines using GPS to reassure manhole locations, erosion damage, etc.

Walking/Bike Trails
Work closely with land planners and landscape architects to create path/trail system that maximizes space requirements and natural topography features.

Airport Projects
Control vegetation height to compliance regulations
Prepare for runway expansion/extension
Mowing maintenance programs

Site Prep/Planned Developments
Iinitial primary road clearing to prepare for secondary road systems and home sites
Demolition of vacant structures
Ability to reduce amount of equipment on site which in turn reduces ground disturbance

Basic Vegetation Control Operations
Control vegetation along ditch channels, roads, railway lines, retention ponds, and flood control areas


Access To Surveyor Crews
Allows surveying to be easier, efficient, and fun
Helps finding the "true line" easier
Crews love this technology


© 2007 Precision Forestry and Landscape Clearing. All rights reserved. Site design by UpgradedImage.net